Full Livery Taxi Wrap Advertising in London
A full livery wrap turns a London black cab into a moving brand statement, with complete vehicle coverage for launches and major campaigns.
Get a Campaign QuoteComplete vehicle coverage
A multi-panel full-wrap system covers the cab, so your brand is seen from every angle in traffic, at ranks and across the city.
Professional installation and removal
Each cab is prepared, wrapped and quality-checked by specialist installers. A full livery installation takes approximately three to three-and-a-half hours per taxi, and the wrap is professionally removed at the end of the campaign.
TfL approval managed
All London taxi advertising is subject to TfL approval. We coordinate the artwork approval for you; it typically takes around seven days, so build it into your timeline.
Four or eight weeks
Most of the cost is production, installation and removal, which is incurred once. A longer campaign spreads that cost across more weeks, so eight weeks is often better value than four.
At a glance
- •Format: full vehicle wrap, with optional interior tip-seat advertising
- •Typical fit time: approximately three to three-and-a-half hours per taxi
- •Campaign length: four or eight weeks
- •Campaign size: up to 100 licensed London black cabs
- •TfL approval required, typically around seven days
- •Registered keepers must notify the DVLA if the wrap changes the recorded colour
- •Installation photography and removal coordination included in a managed campaign
Questions
What is a full livery taxi wrap?
A full livery wrap covers the whole vehicle in your campaign graphics, so the black cab becomes a moving advertisement visible from every angle.
How long does a full wrap take to fit?
A full livery installation takes approximately three to three-and-a-half hours per taxi, because it needs preparation, specialist installation and quality control.
Do I need to tell the DVLA?
If a full wrap changes the recorded colour of the taxi, the registered keeper must notify the DVLA and update the vehicle details. We make participating drivers aware of this as part of onboarding.
How long does TfL approval take?
Approval typically takes around seven days from submission, and requested amendments to artwork can add time, so build it into your plan.
Is four weeks or eight weeks better?
Four weeks is available, but where you have flexibility eight weeks usually gives better value, because the production, installation and removal costs are incurred once.
More London taxi advertising formats
All London taxi advertising is subject to TfL approval.